June 21 - 22, 2001

After a long downtime, the foundation has been backfilled and rough grade applied. Drainage and sump have been installed (drainage = good), and stone has been added to the basement, garage, and driveway.

Follow the grey stone road...:   ...to the garage:  

Basement filled with stone; and drainage and sump:
      

Someone trying to hurt themselves:

Side wall rough grade and porch:   

Click on any image for a larger view.